Buying Spiral Duct and Fittings in Bulk: A Take-Off Checklist

How to turn a drawing schedule into a take-off a supplier can quote line by line: diameters, lengths, gauge, coating, fitting types, seals, packing and container loading, and what to check when the goods arrive.

Who this guide is for

This guide is for HVAC contractors, distributors and duct shops that buy finished spiral duct and round and rectangular fittings in container quantities, either instead of making them or alongside their own production. A clean take-off saves a round of questions, and it is the document your supplier prices from. Our duct fittings range is quoted line by line from exactly this list.

Why the take-off matters more than the straight pipe

Most of the line count on a round duct job is not the straight pipe. It is the bends, tees, reducers, couplings and dampers in every size on the drawings. One missing coupling size can stop an installer for a day, so the take-off should list everything the system needs, and the order should carry a small allowance for site changes.

Step 1. List by item, diameter and length

Build the list as one row per item and size. For spiral duct, give the diameter, the length per piece and the total metres. Our standard spiral range runs from Ø80 to Ø500, with larger diameters on request, in 3 m, 4 m or 5 m lengths. Choose the length for the truck and the site: long pieces mean fewer joints, shorter pieces are easier to carry up a riser.

Group the fittings by family so nothing is forgotten:

If the job also has flat oval or rectangular runs, add the oval fittings (major and minor dimensions for every item) and the rectangular duct and fittings (width x height, and the flange type such as TDF, TDC or angle) to the same list. For insulated systems see pre-insulated duct and fittings, for noise control the silencers and plenum boxes, and for the terminals grilles, diffusers and air valves.

Step 2. State gauge and coating on every line

Gauge and coating change the price and the weight, so write them down rather than leaving the supplier to guess. On our pages, standard sheet thickness for spiral duct runs from 0.5 mm in the small diameters to 0.8 mm at Ø500, and bends, couplings and other fittings follow a similar pattern, with the exact figure confirmed per line on the quotation. Galvanised steel is supplied as Z80 or Z275 to your specification.

The Z number is the zinc coating designation. Under EN 10346, Z275 means a minimum total coating mass of 275 g/m² counted over both surfaces, so a higher number means more zinc and longer protection in a damp or coastal site. If your specification names a coating or a sheet standard, copy it onto the take-off. If it does not, tell us the environment and we suggest a coating on the quotation. Stainless steel and aluminium are available on request for the lines that need them.

Step 3. State pressure, sealing and leakage

Say what the system has to do. Our listed working pressure for spiral duct is -3000 Pa to +5000 Pa. Your project specification may call up a pressure class and a leakage class instead, and the two are different questions: pressure class is about strength, leakage class is about how much air escapes through seams and joints. Our guides on duct pressure classes and air leakage classes explain how each is read.

For circular duct, EN 12237 specifies strength and air leakage requirements and test methods for ventilation duct. SMACNA publishes a leakage test manual that uses leakage classes and a test pressure. Which one applies depends on your market, so put the standard and class from your specification on the order, and ask us to confirm the seals and gauge against it.

Then choose the joint. Fittings are supplied rubber-sealed or with plain ends. The rubber seal is EPDM, fixed on the spigot so it does not slide or fall off during assembly. Plain ends suit shops that seal at the joint with sealant, tape or mastic. For flanged rectangular work, the corners, clips, gaskets and sealant are separate lines, and our guides cover TDF and TDC flange corners and clips and duct sealant, flange gasket and tape.

Step 4. Plan the packing and the container

Spiral pipe is mostly air, so packing decides the freight. Straight spiral duct can be nested, with smaller diameters travelling inside larger ones where the diameters allow, and bundled or cartoned. Bends nest the same way: on one export order the Ø150 and Ø200 bends travelled inside the Ø250 bends in the same carton, so three diameters took the space of one. Dampers do not nest and go in cartons.

Practical points for loading:

  • Ask for nested packing in the take-off, and list the nesting sets you want, such as all Ø150 to Ø250 bends together.
  • Tell us the container size and any weight or height limit at your end, such as a forklift or a narrow yard.
  • Mark the order of delivery to site, so what you need first can be unloaded first.
  • Ask how bundles are strapped and whether the ends are protected, since a crushed edge on a spigot will not seal.

Step 5. Add machines and consumables to the same shipment

Many buyers do both: make the high-volume sizes in house and buy the awkward fittings finished. If you would rather make your own spiral pipe and fittings, see the spiral tubeformer. Either machines or consumables can share a container with finished fittings, so freight is paid once. Tell us at the take-off stage so we plan the packing together.

Step 6. What the supplier needs to quote

  • The take-off, in Excel, PDF or as a photo of the drawing schedule
  • Item, diameter and quantity for each line, and the length per piece for duct
  • Sheet thickness or the standard you build to, and the zinc coating
  • Seal type, rubber-sealed or plain ends
  • The leakage or pressure class, if your specification names one
  • Delivery port, and whether the goods ship alone or with a machine

There is no price list, because the price depends on diameter, gauge, coating and quantity for each line. Lead time depends on the item mix and quantity and is confirmed at quotation. As a guide, a recent mixed order of about 1,900 bends and dampers was produced in 50 working days.

Step 7. Inspect on arrival

Agree the inspection before the order, not after. A quick routine on arrival:

  • Count cartons and bundles against the packing list before the carrier leaves.
  • Check the outside of each package for crushed corners, strap damage and water.
  • Open a sample from each size and check the diameter, the seam, the coating and the seal against the order.
  • Test-fit a few spigots into the matching duct and couplings, because a fitting that does not slide in is a size problem or a crushed edge.
  • Photograph and note any damage on the delivery paperwork, then report it quickly.

Taokron handles the take-off review, quotation, pre-shipment inspection, shipping and after-sales support from Melbourne, so you have one contact for the whole order.

Common mistakes

  • Listing the straight duct and forgetting couplings, end caps and sliding couplings.
  • Leaving gauge and coating off, so quotes from different suppliers cannot be compared.
  • Not saying the seal type, then finding plain ends on a job that needed rubber seals.
  • Ordering every size as a separate carton when the smaller sizes could have nested inside the larger.

Send your take-off for a quote in 12 hours →

Taokron supplies these fittings. Catalogue figures are confirmed on the quotation for your order.

FAQ

What do I send to get spiral duct and fittings quoted?

Your take-off as a list, Excel or PDF, or a photo of the drawing schedule. For each line give the item, diameter, quantity, sheet thickness (or the standard you build to), zinc coating (Z80 or Z275), seal type (rubber-sealed or plain ends), the delivery port, and whether the goods ship alone or with a machine order. Tees need main in, main out, branch and angle.

Is there a price list for fittings?

No. Every line is quoted from your take-off, by diameter, gauge, coating and quantity, and the quotation is per order quantity.

How are spiral duct and fittings packed for a container?

Spiral duct travels in straight lengths, nested where diameters allow, in bundles or cartons. Smaller bends can be packed inside larger ones, and dampers go in cartons because they do not nest. Packing is agreed when we quote, so tell us if you need to fit a set container size.

Which leakage standard should I put on the order?

Use the one your project specification names. EN 12237 covers strength and air leakage of circular sheet metal duct, and SMACNA publishes a leakage test manual that works with leakage classes. Our guides on duct pressure classes and air leakage classes explain how each is read. Tell us the class and pressure so we can confirm seals and gauge on the quotation.

Can fittings ship in the same container as a machine?

Yes. Fittings can ship on their own or share a container with a machine order, and consumables such as flange corners, clips, sealant and gasket tape can go in the same shipment. Tell us at the take-off stage so packing is planned together.

What should I check when the container arrives?

Count cartons and bundles against the packing list, check the outside for crushed edges or water, open a sample of each size, and check diameter, seals, coating and seam condition against your order before you sign for the goods. Photograph any damage before moving it and report it quickly.

Duct Shop Notes

One email a month for duct shop owners

Notes on machine choices, shop layout, duct standards and new machines. Reply "unsubscribe" any time to stop.

12-hour reply

Send your take-off: items, sizes and quantities per order. Ryan Tao replies within 12 hours with a quotation and lead time.

Ask an engineer

Engineer reply

Send your take-off

Tell us the items, sizes and quantities you need. Ryan Tao replies within 12 hours.