Fabricating ductwork for hospitals: what changes for a duct shop

Hospital work pays well and asks more of a duct shop than a commercial fit-out: tighter sealing, cleaner handling, smooth interiors, access for cleaning and a paper trail for every test. This guide sets out what the published healthcare documents actually say about ductwork, with the edition I checked for each, then what changes on your shop floor and which machines help. It is written for fabricators deciding whether to tender, not for designers.

What healthcare specs ask of ductwork

There is no single hospital duct standard. A healthcare job normally stacks a national ventilation standard, a state or national health facility guideline, a duct construction standard and then the project specification, which usually wins. The table lists what I could verify in published text, with the edition read. Editions change, so treat it as a map and confirm the one your tender cites.

DocumentWhat it says about ductwork
HTM 03-01 Part A, England (2021 edition, which replaced the 2007 edition)Galvanised sheet steel is suitable for normal ventilation and air-conditioning, and the duct material should suit the air and the environment. Ductwork is made and installed to the current BESA specification. Flexible duct is not suitable for distribution; it is allowed only as the final connection to a terminal, no more than 0.5 m long, in exceptional cases. The inside of the duct should be free of structural projections and as smooth as possible, with flanged gasketed joints preferred for rectangular duct. Sound-absorbing material should not be applied to the inside surface of a duct.
HTM 03-01 Part A (2021), installation and commissioningDuctwork is to be installed to the Advanced Level of BESA TR/19 (2019), and open ends are sealed as installation progresses. Leakage tests follow BESA DW/143 methods with a permissible leakage rate of not more than 3 percent, a section at a time before insulation is applied, with results recorded in the commissioning manual.
VHHSBA Engineering Guidelines Vol 4 (HTG-2020-004, May 2020, Victoria)Duct systems designed in line with AS 4254 and accessible for cleaning, with access panels at each coil, fire and smoke damper and each change of direction. No internal thermal insulation in systems serving clinical areas. Supply, return and exhaust fully ducted in clinical areas, with no ceiling or roof void return plenums. For isolation rooms it points designers to AS 1668.2 and ASHRAE 170.
ASHRAE/ASHE 170 (United States)The ventilation standard for health care facilities. Trade press summaries say duct lining is restricted downstream of the final filter stage, with exceptions for impervious-faced liner in terminal units and attenuators. I could not read the clause itself, so check the adopted edition.
SMACNA Duct Cleanliness for New ConstructionThree levels, basic, intermediate and advanced, each adding to the one below. Advanced allows labels on external surfaces only and requires sections to be covered, wrapped or capped in transport and storage, with sealed ends inspected and resealed if damaged.

Three things follow for a fabricator. The interior matters: no exposed lining, no projecting fasteners, smooth joints. Cleanliness matters from the moment duct leaves your bench, not when it reaches site. And testing is evidence, so the results are part of the deliverable. For the standards behind AS 4254 and AS 1668.2 see the AS 4254 reference and the AS 1668.2 reference.

Leakage, sealing and joints

Leakage is set in the shop. Healthcare documents lean on the duct construction standard and the project specification for the actual number, so the practical move is to price to the class named in the tender and prove it. The duct air leakage classes guide covers SMACNA seal classes, EN 1507 classes A to D and the AS 4254.2 percentage approach, and the sealants and gaskets guide covers what goes in each joint. The short version for hospital work:

  • Longitudinal seams. A Pittsburgh lock rolled consistently, then sealed, is the common rectangular seam. Inconsistent lock depth is what makes a sealant job slow and a test fail.
  • Transverse joints. TDF flanges with a continuous gasket, or the flange type the spec names. HTM 03-01 states a preference for flanged gasketed joints in rectangular duct. See TDF versus TDC if the spec leaves it open.
  • Corners. Corner pieces and corner sealing are the usual leak points in rectangular duct. Fit and seal them the same way every time.
  • Penetrations and access doors. Doors and hatches are part of the leakage path, so seal them as carefully as the seams and test sections with them fitted.

Cleanliness in the shop, in transit and on site

A hospital client is paying for duct that arrives clean and stays clean. Whichever level the tender names, the shop-side habits are the same:

  • Keep finished duct off the floor in a clean, dry area, away from grinding, cutting and plasma work.
  • Cap or wrap open ends before the duct leaves the bench, and use caps that stay on in transit. If you are to be paid for a cleanliness level, say which one in the offer.
  • Keep identification labels on external surfaces. The advanced level in the SMACNA guideline requires it.
  • Wipe interiors where the level or spec asks for it. Capping limits dust ingress but does not by itself guarantee handover cleanliness. HTM 03-01 says ducts should be cleaned internally to restore the TR/19 advanced standard if there is doubt, so some jobs add a specialist clean after installation.

Access doors, dampers and records

Both HTM 03-01 and the Victorian guidelines expect access to every damper, coil and turn that needs inspection or cleaning, and HTM 03-01 asks for a hatch beside each fire damper so its operation can be seen. That makes door and hatch locations, frames and gaskets a drawing item, not a site afterthought. The dampers and access doors guide and the fire and smoke damper integration guide cover the details.

Records are where first-time healthcare shops lose time. Expect to supply material certificates for the steel and stainless used, sealant and gasket product data, a leakage test record per tested section and a drawing-to-spool trace so any piece can be found. The tolerance and inspection guide and the acceptance test checklist are good templates for the paperwork habit.

Material by zone

Galvanised steel is the normal choice for general ventilation. Stainless is used where moisture or corrosive air is high and in very clean spaces, and cleanroom-class spaces bring welded construction and surface-finish limits. Those are covered in the cleanroom duct manufacturing guide and the 316L versus 304 guide, and not repeated here. The point for tendering: price each zone to its own material and joint method, and do not assume one construction covers the whole building.

What changes in your shop

  • Repeatable seams and flanges. The biggest lever on leakage is every lock and flange being the same. Machine-formed profiles do that better than hand work.
  • A leakage test routine. Test sections with a calibrated rig and keep the record with the job number. The test method is in the leakage guide.
  • A clean zone. A marked bay for finished duct, with caps and wrap on hand and a rule that nothing is stored open.
  • Traceability. Coil or heat numbers recorded against spools, and a label scheme agreed with the client.
  • First-off checks. Check and record the first piece on every size change.

Taokron machines that help

For rectangular duct, start with consistency at the cut-and-fold stage and at the seam and flange. Figures below are from each product page.

JobMachineFrom the product page
Coil-fed duct productionRectangular Duct Line II, SBAL-III0.5-2.0 mm; 18 m/min feeding; SBAL-III length tolerance ±0.5 mm, diagonal ±0.8 mm
Inline Pittsburgh lock and TDFSBAL-V0.5-1.5 mm; 18 m/min; U-shape line, 14,500 mm long
TDF flange formingSBTDFSBTDF-12 0.5-1.2 mm, SBTDF-1.5-16 0.8-1.5 mm; flange height 35±0.5 mm
Pittsburgh lockLockformer SBLC series0.4-1.2 mm (SBLC-12); 0.7-1.5 mm (SBLC-15)
Seam closingDuct Zipper SBHF-1.5×1500TDF, Seam Closing Machine SBHF-I0.8-1.5 mm double-sided closing; SBHF-I 0.5-1 mm
CornersCorner inserting SBCC, Auto Corner Making MachineSBCC up to 1.5 mm; corner making 0.8-1.0 / 1.0-1.2 mm
FoldingHydraulic Folding Machine SBWSSBWS-1.5×1500H 0.4-2.0 mm
CuttingPlasma Cutter SBPC15500.4-4 mm; 7-8 m/min

For round duct, the SBTF-1602 spiral tubeformer makes Φ80 to Φ1600 mm in galvanised steel 0.4-1.3 mm, stainless 0.4-0.8 mm or aluminium 0.4-1.3 mm, and the SBTF-1500 covers Φ80 to Φ1500 mm. A machine does not make a spec pass on its own: sealant, gasket choice and workmanship still decide the test, which is why the line choice follows your gauge range and the joints the tender allows. Taokron has built duct machines since 1994, with machines in 100+ countries and 60+ patents behind the designs, from an ISO 9001:2015 factory with an Australian office in Box Hill North, Victoria. Installation and commissioning are quoted per engineer-day, and warranty is 12 months from arrival at your factory.

Send your tender joint types and gauge range, get an answer in 12 hours →

FAQ

Do hospitals need stainless steel ductwork?

Not as a blanket rule. HTM 03-01 Part A (2021 edition) says galvanised sheet steel is suitable for normal ventilation and air-conditioning, and says the duct material should suit the air and the environment. Stainless is more common in cleanroom-type spaces and wet areas. The project specification decides by zone, so read it before pricing. See the stainless versus galvanised guide for the cost and shop effects.

Is internal duct lining allowed in hospital ductwork?

Often not. The Victorian guidelines (HTG-2020-004, Volume 4) say internal thermal insulation of ductwork is not permitted in systems serving clinical areas, and HTM 03-01 (2021) says sound-absorbing material should not be applied to the inside surface of a duct. Trade press summaries of ASHRAE 170 describe a similar restriction in the United States. Hospital ductwork is normally insulated on the outside, and silencers sit in plant rooms. Always check the edition your project cites.

What duct leakage class do hospital jobs require?

The documents I read do not fix one duct class for all hospital work. They point to the duct construction standard and the project specification, and require leakage tests with the results recorded; HTM 03-01 (2021) sets a permissible leakage of not more than 3 percent for its tests. Some specifications name tighter classes such as SMACNA Seal Class A or EN 1507 class C or D, so the number comes from the tender documents. Our leakage class guide explains how to convert between the systems.

What does TR/19 or SMACNA duct cleanliness mean for a fabricator?

Both are about keeping dust out of duct between your shop and the finished building. HTM 03-01 asks for ductwork installed to the Advanced Level of TR/19 (2019), and for open ends to be sealed as installation progresses. SMACNA's guideline has basic, intermediate and advanced levels, and the advanced level requires sections to be covered, wrapped or capped in transport and storage. If a tender does not name a level, state in your offer which one you are pricing.

Can a shop with Pittsburgh lock and TDF machines do hospital ductwork?

Yes, if the specification accepts those joints, and many hospital specifications do for general areas. Spec writers usually care about the result: sealed seams, gasketed flanges, a smooth interior and a passing leakage test. Very clean zones may ask for welded or stainless construction, which is a different process. Check the joint type for each zone before you tender.

Which Taokron machines are relevant to healthcare duct?

For rectangular duct, the coil-fed lines (Rectangular Duct Line II, SBAL-III and SBAL-V), TDF flange formers, lockformers, duct zippers, corner machines, folders and plasma cutters give repeatable seams and flanges. The SBTF spiral tubeformers cover round duct. Each product page lists thickness range and capacity, and a Taokron engineer replies within 12 hours if you send your gauge range and joint types.

Duct Shop Notes

One email a month for duct shop owners

Notes on machine choices, shop layout, duct standards and new machines. Reply "unsubscribe" any time to stop.

12-hour reply

Tendering a hospital or healthcare job? Send your gauge range, joint types and the leakage class in the spec, and a Taokron engineer will reply within 12 hours with a straight recommendation.

Ask an engineer

Engineer reply

Ask an engineer about this guide

Describe your job and what you are trying to make. Ryan Tao replies within 12 hours.

Guide: Fabricating ductwork for hospitals: what changes for a duct shop

Not ready for a quote? Get the 2026 catalogue by email: 66 duct machines, one page each.

Machinery for this application

Healthcare rectangular duct runs on auto duct production lines and TDF flange and lockformer machines, or browse the full machine catalog.