Nepal's ductwork market centres on the Kathmandu Valley, with hotels, hospitals and new buildings spreading to Pokhara, Chitwan and the Bhairahawa and Lumbini corridor on the southern plains. This guide is for duct shop owners and HVAC contractors in Nepal who are deciding whether to add capacity or automate. It covers demand in 2026, code and specification questions, import points to settle with a customs agent, the 230/400 V 50 Hz supply, and the machine set-ups that fit, rectangular duct first.

Why Nepal in 2026

Nepali HVAC work comes from hotels and tourism, healthcare, public buildings and airports, and a new push to put hydropower to use in data centres and industry. None of these carries the market alone, so a shop that serves two or three of them is safer than one that depends on a single contractor.

Hotels and tourism

The Nepal Tourism Board counted 1,158,459 international visitors in 2025, about 96.8% of the 2019 level. Press reports in March 2026 described a groundbreaking for a Ritz-Carlton on Durbar Marga in Kathmandu, developed by CG Hospitality; reports give opening years between 2029 and 2031. The Kathmandu Post reported in August 2026 that Hyatt Regency and Holiday Inn hotels are being built in the Bhairahawa and Lumbini corridor, and that Lumbini Palace Resort is being upgraded to a Marriott branded property. Hotels need room ventilation, kitchen extract and car park ventilation, all in sheet metal. Treat each project as a lead, not a sure order, because schedules move.

Hospitals and healthcare

In May 2026 the Bhat-Bhateni Group handed over a children's hospital building worth about NPR 710 million to the Kathmandu Institute of Child Health at Budhanilkantha. Operating theatres, isolation rooms and laboratories need tightly sealed, often stainless ductwork; see our cleanroom duct guide and galvanised vs stainless comparison.

Airports and public buildings

Pokhara International Airport and Gautam Buddha International Airport at Bhairahawa are both built, and the FY 2083/84 budget speech announced that both would be operated with private sector involvement under a public private partnership. We found no named partner or timeline.

Data centres and industry

The Kathmandu Post reported in April 2026 that the government wants Nepal to become a regional data centre and compute hub powered by hydropower, that Ncell says its Lalitpur data centre is enlisted by the Department of Information Technology under 2025 directives, and that Nepal still has no clear rules for new facilities. Nothing here is firm yet, so view it as upside, not a base case.

Building code and standards for ductwork in Nepal

The Nepal National Building Code (NBC) is maintained by the Department of Urban Development and Building Construction. We could not find a Nepali duct construction standard that replaces the international documents. In practice a duct shop builds to what the consultant's specification names.

  • NBC parts: the architectural part (NBC 206) covers lighting and ventilation, and the electrical part (NBC 207) covers electrical design. Neither is a duct fabrication standard, and parts are revised from time to time, so ask which edition your project follows.
  • Seismic design: Nepal is seismically active and NBC 105:2020 is the current seismic design code for buildings. It bears on hanger and support design; see our hangers and supports guide.
  • SMACNA, ASHRAE and similar: consultant specifications commonly cite international documents for gauges, seams and joints. We did not find a public source showing which is most common in Nepal, so ask for the specification. See our international standards comparison and the gauge chart.

Importing duct machinery into Nepal

  • VAT: budget summaries for fiscal year 2083/84 (2026/27) state that the VAT rate stays at 13%.
  • Customs duty: the same summaries say the customs structure was reduced from 11 tiers to 7 and that some raw material duties were cut. We could not find the rate that applies to duct forming machinery, so we do not quote one.
  • What to do: ask a licensed customs agent to classify the machine and confirm the current duty, VAT and any other charges, and to tell you which documents they need from us.

Nepal is landlocked. Sources we found describe sea freight reaching Nepal through the Indian ports of Kolkata, Haldia and Visakhapatnam, then by rail or road, with Birgunj Inland Container Depot as the main dry port. Those descriptions are older, so ask your forwarder for current routes, transit times and border charges. Our importing guide covers the general paperwork.

Power supply: 50 Hz, 230/400 V

Nepal's supply is generally given as 230 V at 50 Hz, and country tables list 400 V three phase, which is consistent with 230/400 V. Our machine pages list 380 V, 50 Hz, three phase; tell us your measured workshop voltage and we wire the motors, drives and control transformer to suit. On supply quality, the Nepal Electricity Authority reported uninterrupted supply during the July 2026 monsoon, when Nepal was exporting surplus power, while other reports describe imports from India in the dry season and unscheduled cuts in some areas. Floods in September 2026 also damaged some hydropower projects, and India approved extra supply to Nepal. If your site sees dips or interruptions, say so, because PLC controlled lines and hydraulic units run better on a stable supply. See also duct machine voltage and frequency by country.

Typical Nepali shop set-ups and the machines that fit

Contractor shop, rectangular duct for hotels and fit-outs

Start with the Rectangular Duct Line II SBAL-II or the Auto Duct Line SBAL-III. Both take 1250 or 1550 mm wide coil and form 0.5 to 2.0 mm sheet at up to 18 m/min. Add a Pittsburgh lockformer (SBLC series) for 0.4 to 1.2 mm Pittsburgh seams and 0.7 to 1.5 mm snap lock, a TDF flange forming machine for 0.5 to 1.5 mm sheet depending on model, and a pneumatic folder (SBWS series, 0.4 to 1.5 mm on the 1500P model) for fittings and short pieces. That covers straight duct, TDF joints and simple fittings with a small crew.

Volume shop for hotel towers and hospital packages

The Auto Duct Line SBAL-V runs from coil to finished panel on 0.5 to 1.5 mm sheet at up to 18 m/min. A duct zipper closes TDF duct seams on 0.8 to 1.5 mm sheet, and the hydraulic folder (SBWS-1.5-1500H up to 2.0 mm, SBWS-1.2-2000H up to 1.5 mm) handles heavier gauge and longer bends.

Corner parts and fittings

The Auto Corner Making Machine blanks corner pieces at 40 to 120 pcs/min on 0.8 to 1.2 mm sheet, and the Pneumatic Corner Mounting machine SBCC inserts corners into TDF flanges up to 1.5 mm. A Plasma Cutter SBPC1550 cuts fittings and flat parts from 0.4 to 4 mm sheet on a 1550 mm wide table, 4000 or 5000 mm long, so elbows, transitions and offcuts do not need hand marking.

Round duct

Spiral duct suits exposed ceilings, plant rooms and industrial extract. The Spiral Tubeformer SBTF-1500 makes Φ80 to Φ1500 mm duct in 0.4 to 1.2 mm galvanised, the SBTF-1602 goes to Φ1600 mm and 0.4 to 1.3 mm, and the SBTF-2020 reaches Φ2500 mm and 0.4 to 2.0 mm galvanised. The Spiral Duct Flanging Machine SBFB-1600 turns flanges on round duct ends. For a real example, see Kavanagh Industries in Sydney, which added an SBTF-1602 in October 2026.

Labour, space and spares

We did not find a reliable current figure for sheet metal wages in Nepal, so we do not quote one. An auto duct line replaces much of the manual marking, cutting, notching and folding, so a small crew can supply several sites. Ask for an output comparison on your own duct sizes.

On space, the auto duct line is the longest item, with the coil rack at one end and a run-out table at the other. Ask us for a layout drawing based on your building before you sign a lease, and leave room for coil, finished duct and truck loading. Keep coil off the floor and out of the open during the monsoon, because galvanised coil stored in damp conditions can develop white rust. Delivery to a landlocked country takes longer, so ask for a spares list with your quotation. See our factory layout guide.

Working with Taokron from Nepal

  • Machines built since 1994 and supplied to 100+ countries, with 60+ patents, from an ISO 9001:2015 factory
  • CE marked with a Declaration of Conformity
  • Wired for your three phase 50 Hz supply
  • Installation and commissioning quoted per engineer-day
  • Replies within 12 hours by email at [email protected] or on WhatsApp at +61 435 074 994

Get a Nepal-ready Taokron quotation →

FAQ

Which ductwork standards are used in Nepal?

The Nepal National Building Code is issued through the Department of Urban Development and Building Construction (DUDBC) and its parts cover architecture, electrical work and seismic design (NBC 105:2020). We could not find a Nepali standard for sheet metal duct construction. A duct shop builds to the documents named in the consultant's specification, which may be SMACNA, ASHRAE or another recognised standard. Ask for the specification before you quote or buy coil.

What voltage and frequency do duct machines need in Nepal?

Nepal's supply is generally given as 230 V at 50 Hz, and country tables list 400 V three phase. Our machine pages list 380 V, 50 Hz, three phase, so no frequency change is needed. Tell us your measured workshop voltage and we wire the machine to suit.

What duties and taxes apply when importing duct machinery into Nepal?

The Nepal budget for fiscal year 2083/84 kept VAT at 13%, and summaries say the customs structure was reduced from 11 tiers to 7. We could not find the duty rate for duct forming machinery, so ask a licensed customs agent to confirm the current duty, VAT and other charges before you budget. We do not quote a rate here.

Where is ductwork demand in Nepal coming from in 2026?

The main sources are hotels, hospitals, airports and public buildings, and data centre plans linked to hydropower. Examples include the Ritz-Carlton project in Kathmandu and the Hyatt Regency and Holiday Inn projects in the Bhairahawa and Lumbini corridor. Schedules move, so treat each as a lead.

How do duct machines reach Nepal?

Nepal is landlocked, and sea freight normally goes through Indian ports such as Kolkata, Haldia and Visakhapatnam, then on by rail or road to Birgunj, where the Inland Container Depot is the main dry port. The sources we found are older, so ask a freight forwarder for current transit terms.

Which machines should a new Nepali duct shop start with?

A shop making rectangular duct for hotels, hospitals and commercial buildings usually starts with a rectangular duct line or auto duct line, a Pittsburgh lockformer, a TDF flange former and a folder. Add a duct zipper for seam closing, corner machines as volume grows, a plasma table for fittings, and a spiral tubeformer when round duct becomes regular work. Send your duct sizes and monthly output and a Taokron engineer will propose a machine set within 12 hours.

12-hour reply

Setting up or upgrading a duct shop in Nepal? A Taokron engineer replies within 12 hours.

Ask an engineer

Engineer reply

Ask an engineer about this guide

Describe your job and what you are trying to make. Ryan Tao replies within 12 hours.

Guide: HVAC Duct Fabrication in Nepal 2026: Market, Standards and Machines

Not ready for a quote? Get the 2026 catalogue by email: 66 machines, one page each.

Machinery for this application

The duct fabrication workflows above run on standard Taokron equipment: spiral tubeformers for round duct, auto duct production lines for rectangular duct, and TDF flange and lockformer machines for closure, or browse the full machine catalog.